CONSTRUCTION AND CREDIT BANKING UPPER CERTIFICATION
Preparation of Electrical Power Calculations and Loading Charges;
Installed power: nominal electricity values of equipment and equipments
Day 1: Today's status values
Dayend: Maximum values that can be loaded Mechanical Requirements;
Mechanical works specified in the meeting report dated 28.11.2016.
Preparation of the mechanical and thermal accounting reports
Heat gain calculations of critical areas,
Checking and renewing the air conditioner selection outputs.